As least it's Sellers and not Rob Cosman. Something about the dude I don't like, and I think it's directly related to how he'll put his name all over everything.
Anyway, we're at the small updates stage, just getting things organized and into a semblance of their final positions.
My old clamp rack took up over five feet of linear wall space. This one less than three, and holds more.
Not going to bother installing the AC until spring, but this guy is already getting some work. Even with the ceiling and attic insulation to go, and the gap between the roof and wall to be addressed, this little guy warms things up quickly. Insulating the floor was a smart move.
Until I re-imagine the miter saw station and upper cabinets, this will do for storage.
Temp install of the air cleaner. Will move more toward the middle once I do a final decide on lighting amounts.