On the cost of shooting 3D:
These studios are rushing through their 3D. There is a right way to do it and a wrong way. I think, personally. If you want to do proper 3D its a $30 million price tag. You dont to admit it, but thats what it really is to do proper 3D. Studios will sometimes do it or $10 million, or $12 million. $30 million, in terms of the equipment, the crew. That camera equipment is really expensive to rent. And if you want to do dual eye-rendered robots, you got another 30% charge, because you got two eyes now, two different visual effects that have got to be blended. Theres more work on the visual effects shots.
Depth, you cant really appreciate 3D because you need like 3 or 4 seconds, most people do, to really feel 3D.
. But its actually changed my style on this movieIve got many more wides, the cameras not wild. So it does change my style a bit.