NinjaCoachZ
Member
Oh, I forgot about the KH 2.8 collection. Think that'll be an October release. Likewise I think Dissidia will get its home console port in mid-2017.
Do we know if 2.8 is $60 or $40? I heard it was 60 last I checked.
I'm just curious to know how timely the FFVII chunks will be. Annual seems logical but it risks taking too long and burning us out. Ideally there'd be 3 parts with six months in between (i.e.: Holiday 2017 / June 2018 / Holiday 2018), but I dunno how possible that is.
Then again, they've already made surprising progress plus they're taking great measures to ease development (Unreal Engine, teaming up with CC2 and other devs), so it could be doable? Maybe? I mean they could theoretically have Part 1 done by mid-2017 but just wait until the holiday if they feel that's a better time to release it.
Do we know if 2.8 is $60 or $40? I heard it was 60 last I checked.
I'm just curious to know how timely the FFVII chunks will be. Annual seems logical but it risks taking too long and burning us out. Ideally there'd be 3 parts with six months in between (i.e.: Holiday 2017 / June 2018 / Holiday 2018), but I dunno how possible that is.
Then again, they've already made surprising progress plus they're taking great measures to ease development (Unreal Engine, teaming up with CC2 and other devs), so it could be doable? Maybe? I mean they could theoretically have Part 1 done by mid-2017 but just wait until the holiday if they feel that's a better time to release it.